Confirm the complete order scope
Record the exact quantity and included scope of rigs, compressors, drilling tools, accessories and spare parts.
A shipping quotation uses the selected machine, dismantling plan, measured dimensions and weight, destination port and trade terms.
Record the exact quantity and included scope of rigs, compressors, drilling tools, accessories and spare parts.
Confirm length, width, height and weight in the planned dismantled condition instead of relying only on brochure data.
Specify loading port, destination port, final destination and responsibilities under FOB, CFR, CIF or EXW.
Evaluate standard container, high-cube, flat rack, RoRo or breakbulk options against the measured cargo and available route.
Confirm removable parts, reassembly responsibility, protective packing and securing method, and retain loading records.
Prepare commercial and packing documents for the actual sale scope and destination, then coordinate handover with the freight forwarder.
The final method and cost depend on measured machine data, route capacity, port requirements and the freight forwarder's formal quotation.